Menu Close

Lead Time

Lead Time

The lead time of every product can vary due to the manufacturing process. Please use our table below to see the lead times on each of our products. This list is updated frequently to have the latest up to date information.

Weeks



  • 00
  • 02
  • 04
  • 06
  • 08
  • 10
  • 12
  • 14
  • 16
  • 18
  • 20

DINING / TRAINING / CONFERENCE / MULTI-PURPOSE

Arlo Collection
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 9-11 weeks
  • Solid Surface Top 9-11 weeks
  • Back Painted Glass Top 9-11 weeks
  • Wood Plank Top 9-11 weeks
  • Glass Top 9-11 weeks


Atlantis / Cosmo / Elite / Margo / Pax / Raise / Slide / Archie Collections

Powder Coat Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 6-8 weeks
  • Laminate Top / Urethane Edge 6-8 weeks
  • Laminate Top / Resin Edge 6-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 5-6 weeks
  • KrystalCast Top 5-6 weeks
  • Stone Top 5-6 weeks
  • Back Painted Glass Top 7-8 weeks
Atlantis / Cosmo / Elite / Margo / Pax / Raise / Slide / Archie Collections
Polished Chrome Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 9 weeks
  • Laminate Top / Urethane Edge 9 weeks
  • Laminate Top / Resin Edge 9 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 9 weeks
  • KrystalCast Top 9 weeks
  • Stone Top 9 weeks
  • Back Painted Glass Top 9 weeks


Oscar / Skipper Collections

Powder Coat Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 6-8 weeks
  • Laminate Top / Urethane Edge 6-8 weeks
  • Laminate Top / Resin Edge 6-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 5-6 weeks
  • KrystalCast Top 5-6 weeks
  • Stone Top 5-6 weeks
  • Back Painted Glass Top 7-8 weeks
Oscar / Skipper Collections
Polished Chrome Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 8-9 weeks
  • Laminate Top / Urethane Edge 8-9 weeks
  • Laminate Top / Resin Edge 8-9 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 8-9 weeks
  • KrystalCast Top 8-9 weeks
  • Stone Top 8-9 weeks
  • Back Painted Glass Top 8-9 weeks


Pinnacle Collections

Powder Coat Bases (without WAD or UM1 option)
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 6-8 weeks
  • Laminate Top / Urethane Edge 6-8 weeks
  • Laminate Top / Resin Edge 6-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 5-6 weeks
  • KrystalCast Top 4-5 weeks
  • Stone Top 5-6 weeks
  • Back Painted Glass Top 7-8 weeks
Pinnacle Collections
Powder Coat Bases (with WAD or UM1 option)
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 6-8 weeks
  • Laminate Top / Urethane Edge 6-8 weeks
  • Laminate Top / Resin Edge 6-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 5-6 weeks
  • KrystalCast Top 4-5 weeks
  • Stone Top 5-6 weeks
  • Back Painted Glass Top 7-8 weeks
Pinnacle Collections
Polished Chrome Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 8-9 weeks
  • Laminate Top / Urethane Edge 8-9 weeks
  • Laminate Top / Resin Edge 8-9 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 8-9 weeks
  • KrystalCast Top 8-9 weeks
  • Stone Top 8-9 weeks
  • Back Painted Glass Top 8-9 weeks


Aven Collection
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 8-9 weeks
  • Laminate Top / Urethane Edge 10-11 weeks
  • Laminate Top / Resin Edge 10-11 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Back Painted Glass Top 10-11 weeks


Connor Collection
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 10-11 weeks
  • Laminate Top / Urethane Edge 10-11 weeks
  • Laminate Top / Resin Edge 10-11 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Back Painted Glass Top 10-11 weeks


Geo Collection

Metal Cylinder Bases & Powder Coat Finish
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 7-8 weeks
  • Laminate Top / Urethane Edge 7-8 weeks
  • Laminate Top / Resin Edge 7-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • KrystalCast Top 7-8 weeks
  • Stone Top 7-8 weeks
  • Back Painted Glass Top 7-8 weeks

Geo Collection

Metal Cylinder Bases & Polished Chrome Finish
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 9-10 weeks
  • Laminate Top / Urethane Edge 9-10 weeks
  • Laminate Top / Resin Edge 9-10 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • KrystalCast Top 9-10 weeks
  • Stone Top 9-10 weeks
  • Back Painted Glass Top 9-10 weeks

Geo Collection

Cylinder / Cube Bases & Laminate
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 10-11 weeks
  • Laminate Top / Urethane Edge 10-11 weeks
  • Laminate Top / Resin Edge 10-11 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Back Painted Glass Top 10-11 weeks

Geo Collection

Cylinder / Cube Bases & Veneer
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 10-11 weeks
  • Laminate Top / Urethane Edge 10-11 weeks
  • Laminate Top / Resin Edge 10-11 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Back Painted Glass Top 10-11 weeks


Koen Collection

Powder Coat Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 7-8 weeks
  • Laminate Top / Urethane Edge 7-8 weeks
  • Laminate Top / Resin Edge 7-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 7-8 weeks
  • KrystalCast Top 7-8 weeks
  • Stone Top 7-8 weeks
  • Back Painted Glass Top 7-8 weeks
Koen Collection
Polished Stainless / Chrome Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 9-10 weeks
  • Laminate Top / Urethane Edge 9-10 weeks
  • Laminate Top / Resin Edge 9-10 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 9-11 weeks
  • Solid Surface Top 9-10 weeks
  • KrystalCast Top 9-10 weeks
  • Stone Top 9-10 weeks
  • Back Painted Glass Top 9-10 weeks


Moment Collection
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 15-16 weeks


Opus Collection

with Metal Panel Inserts
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 6-8 weeks
  • Laminate Top / Urethane Edge 6-8 weeks
  • Laminate Top / Resin Edge 6-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 10-11 weeks
  • KrystalCast Top 5-7 weeks
  • Stone Top 5-7 weeks
  • Back Painted Glass Top 7-8 weeks

Opus Collection

with Laminate Panel Inserts
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 7-8 weeks
  • Laminate Top / Urethane Edge 7-8 weeks
  • Laminate Top / Resin Edge 7-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 10-11 weeks
  • KrystalCast Top 5-7 weeks
  • Stone Top 5-7 weeks
  • Back Painted Glass Top 7-8 weeks

Opus Collection

with Veneer Panel Inserts
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 10-11 weeks
  • Laminate Top / Urethane Edge 10-11 weeks
  • Laminate Top / Resin Edge 10-11 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 10-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Back Painted Glass Top 10-11 weeks


Tony Collection
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 9-10 weeks
  • Veneer Top / Wood Edge 9-10 weeks


Vega Collection

Fixed Height Bases & Laminate / Veneer
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 10-11 weeks
  • Laminate Top / Urethane Edge 10-11 weeks
  • Laminate Top / Resin Edge 10-11 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 10-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Back Painted Glass Top 10-11 weeks


Volow Collection

Powder Coat Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 7-8 weeks
  • Laminate Top / Urethane Edge 7-8 weeks
  • Laminate Top / Resin Edge 7-8 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 10-11 weeks
  • KrystalCast Top 7-8 weeks
  • Stone Top 7-8 weeks
  • Back Painted Glass Top 7-8 weeks

Volow Collection

Polished Chrome Bases
  • Laminate Top / PVC / T-Mold / ABS / Self / Metal Edge 9-10 weeks
  • Laminate Top / Urethane Edge 9-10 weeks
  • Laminate Top / Resin Edge 9-10 weeks
  • Laminate Top / Wood Edge 10-11 weeks
  • Veneer Top / Wood Edge 10-11 weeks
  • KrystalCast Top 9-10 weeks
  • Stone Top 9-10 weeks
  • Back Painted Glass Top 9-10 weeks

PARSONS TABLES

Parsons Collection

Classic Table / Fixed Height
  • Laminate 10-11 weeks
  • Veneer 10-11 weeks
  • Solid Surface Top 10-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks
  • Glass Top 10-11 weeks

Parsons Collection

Liv Table / Fixed Height
  • Laminate 10-11 weeks
  • Veneer 10-11 weeks
  • Solid Surface Top 10-11 weeks
  • KrystalCast Top 10-11 weeks
  • Stone Top 10-11 weeks

OCCASIONAL TABLES

Atlantis Collections

Powder Coat Bases
  • Laminate 6-7 weeks
  • Veneer 9-11 weeks
  • Solid Surface Top 5-6 weeks
  • KrystalCast Top 5-7 weeks
  • Stone Top 5-8 weeks
  • Glass Top 7-8 weeks

Atlantis Collections

Polished Chrome Bases
  • Laminate 7-8 weeks
  • Veneer 9-11 weeks
  • Solid Surface Top 7-8 weeks
  • KrystalCast Top 7-8 weeks
  • Stone Top 7-8 weeks
  • Glass Top 7-8 weeks


Koen Collection

Powder Coat Bases
  • Laminate 6-7 weeks
  • Veneer 9-11 weeks
  • Solid Surface Top 5-7 weeks
  • KrystalCast Top 5-7 weeks
  • Stone Top 5-8 weeks
  • Glass Top 7-8 weeks

Koen Collection

Polished Stainless / Chrome Bases
  • Laminate 7-8 weeks
  • Veneer 9-11 weeks
  • Solid Surface Top 7-8 weeks
  • KrystalCast Top 7-8 weeks
  • Stone Top 7-8 weeks
  • Glass Top 7-8 weeks


Transit Tablet Table Collection

Powder Coat Bases
  • Laminate 6-7 weeks
  • Veneer 6-7 weeks
  • Solid Surface Top 6-7 weeks

Transit Tablet Table Collection

Polished Stainless / Chrome Bases
  • Laminate 8-9 weeks
  • Veneer 8-9 weeks
  • Solid Surface Top 8-9 weeks

DRUM / CUBE TABLES

Drum / Cube Collections

Abbott / Adler / Coast / Synk Collections & Straight
  • Laminate 5-6 weeks
  • Veneer 5-6 weeks
  • Solid Surface Top 5-6 weeks
  • KrystalCast Top 5-6 weeks
  • Stone Top 5-7 weeks

Drum / Cube Collections

Abbott / Adler / Coast / Synk Collections & Tapered
  • Laminate 5-6 weeks
  • Veneer 5-6 weeks
  • Solid Surface Top 6-7 weeks
  • KrystalCast Top 6-7 weeks
  • Stone Top 6-7 weeks

STORAGE & PRESENTATION

Case Goods

Union / Cue Collection
  • Laminate Top 10-11 weeks
  • Veneer Top 10-11 weeks
  • Solid Surface Top 10-13 weeks
  • KrystalCast Top 10-14 weeks
  • Stone Top 10-15 weeks
  • Glass Top 10-16 weeks

Case Goods

Media Wall
  • Laminate Top 10-11 weeks
  • Veneer Top 10-11 weeks
  • Stone Top 10-11 weeks

Case Goods

Silo
  • Laminate Top 13-15 weeks

Glass Boards
  • Painted Back 6-7 weeks

Conveyance Lectern
  • w/Metal Front Panel and/or Shelving 5-7 weeks
  • w/Laminate or Veneer Front Panel and/or Shelving 10-11 weeks

SEATING

Bench Collection

Ritz : Mixx : Brooklyn : Brooklyn II : Williamsburg : Queensboro : Liv
  • COM/Graded-In 9-10 weeks

Coast Seating
  • COM/Graded-In 9-10 weeks

Synk2 Seating
  • COM/Graded-In 9-10 weeks

Climb Seating
  • COM/Graded-In 9-10 weeks

Gresham by Nevins
  • COM/Graded-In 13-15 weeks

PHONE BOOTH

Phone Booths
  • Std w/Std Glass 12-14 weeks
  • BYO w/Std Glass 12-14 weeks
  • Std or BYO w/Tinted Glass 12-14 weeks

ARIEL ACOUSTIC HANGING PANELS

Ariel Acoustic Hanging Panels
  • 2-3 weeks

TABLE CARTS FOR FOLDING TABLES

Table Carts for Folding Tables
  • Framed or Frameless Wall Panels 2-3 weeks
  • Room Divider Stands Dual Sided or Single Sided w/Plastic Back Panel 6-8 weeks
  • Room Divider Stands Single Sided w/Whiteboard Back Panel Cover 6-8 weeks

BIO-CANVAS COLLECTION

Bio-Canvas
  • 6-7 weeks

POWER & DATA UNITS

All Power Units
  • 5-7 weeks

PLANTERS

Planters
  • Rubic / Stem 8 weeks
  • Orbis / Doric 12 weeks
  • Almalfi / Bellini / Benningford / Tisso / Herwin / Savi 2-6 weeks

WASTE & RECYCLING

Waste & Recycling
  • Atlas / Asper / Commodore / Commodore II 4-6 weeks
  • Jumbo 6-8 weeks
  • Max / Maximus 7-8 weeks
  • Thro / Standard Finishes 8-9 weeks
  • Thro / Premium Finishes 9-10 weeks